critical path meaning in Tamil
மாறுநிலைப்பாதை
critical path in Tamil: மாறுநிலைப்பாதை. In English, critical path means the sequence of dependent steps that determine the minimum time needed to carry out an operation.
Tamil words for critical path
- மாறுநிலைப்பாதை
English meaning of critical path
- noun The sequence of dependent steps that determine the minimum time needed to carry out an operation.
Questions about critical path in Tamil
- What is the meaning of critical path in Tamil?
- Critical path in Tamil is மாறுநிலைப்பாதை.
- critical path என்பதன் தமிழ் அர்த்தம் என்ன?
- Critical path: மாறுநிலைப்பாதை.
- What does critical path mean in English?
- Critical path means the sequence of dependent steps that determine the minimum time needed to carry out an operation.
Source and license
Tamil words from Tamil Wiktionary: critical path (page history and authors). English meanings adapted from Wiktionary: critical path (page history and authors). Text available under the Creative Commons Attribution-ShareAlike 4.0 license. Word.ws reformatted the Tamil words and English meanings and added links. Wiktionary data of 2026-09-02.
Last updated:
Cite this page: “critical path meaning in Tamil.” Word.ws, https://word.ws/tamil/critical_path. Based on Wiktionary, CC BY-SA 4.0.
